SwRI: Workforce Development successes include Lean Manufacturing Transformation, Lean Manufacturing Classroom Introduction, Software Implementation, ISO 9001:2000 System Development
Civilian Repair Depot for
Military Aircraft
Lean Manufacturing Transformation
Challenge:
|
|
 |
|
|
Institute staff work closely with
manufacturers to increase their competitiveness through
process improvements. |
Unique civilian / military workforce
collaboration. Service repair environment obscured
identification of repeated tasks. Intense war-time
performance pressure. Multiple facilities with large site
workforce. Full jet-size unit being repaired.
Solutions:
-
Direct leadership of small groups
via focused kaizen events.
-
Classroom training that emphasized
small pilot group success and motivated full-scale
deployment.
-
Cycle time reductions of 30 to 50%
in specific operational areas.
-
Significant reduction of operating
expense, per-unit labor and floor space.
Aerospace Proprietary
Materials Fabrication
Lean Manufacturing Classroom Introduction
Challenge:
|
|
 |
|
|
SwRI's proven methodologies help decrease
lead times, increase throughput, reduce cost and improve
quality. |
Unique industry requirements.
Solutions:
-
Instructor with FAA certification in
composites and specific industry experience leading Lean
Manufacturing projects.
-
Modified introductory curriculum to
include specific industry terms, relevant case examples
(with photos), and the firm's current status for planned
deployment.
Metal Plating Chemistry
Software Implementation
Challenge:
No downtime transition from paper logs
to full use of software reporting.
 |
|
Typical results include productivity
increases of 25 percent, work-in-process reductions of 75
percent, inventory level reductions of 50 percent, and floor
space reductions of 50 percent. |
Solutions:
Electro-Mechanical
Instrumentation Manufacturer
ISO 9001:2000 System Development
Challenge:
|
|
 |
|
|
Using the lean-manufacturing approach,
experienced SwRI engineers apply tools and methods that
enable client personnel to remove waste. |
Previous attempts to integrate a
continuous improvement culture have floundered among the
established firm's high percentage of long seniority
personnel. President's strength is in sales and development
of outside strategic alliances.
Solutions:
-
Improved trainee relevance through
elimination of "exercises" ? instead trainees produced
actual documented work products for use in their
functional area.
-
Limited training session
participants to 1-3 persons from each functional area,
with direct feedback on their implementation progress to
improve accountability.
-
Developed executive coaching for
President to identify improvement opportunities through
his systematic and direct internal auditing of specific
operations.
For more information about workforce development
success highlights and capabilities at SwRI or how you can contract with SwRI, please
contact
Bill
Rafferty at
wrafferty@swri.org or (210) 522-5865.
©1998-2009 Copyright Southwest Research Institute
Printed from:
http://www.swri.org/4org/d10/indeng/workdev/success.htm?
Southwest Research Institute®
(SwRI®) is an independent, nonprofit, applied engineering and physical
sciences research and development organization with
12 technical divisions
using multidisciplinary approaches to problem solving. The Institute occupies
more than
1,200 acres and provides
nearly two million square feet of laboratories, test facilities, workshops, and offices for more than
3,300
employees who perform contract work for industry and government clients.
|