SwRI Thermal Stress Analysis: Compressor System and Pump System Analyses: engineers model piping systems, major system components

  image of Caesar II piping build-up for a thermal analysis of a 6-cylinder reciprocating compressor unit
 

Caesar II piping build-up for a thermal analysis of a 6-cylinder reciprocating compressor unit

To determine static stress caused by thermal expansion, pressure, and weight, engineers at Southwest Research Institute (SwRI) model piping systems and major system components, such as:

  • Support structures

  • Pulsation filter bottles

  • Coolers

  • Pressure vessels

Piping configurations, diameters, restraints, and branch connections can be modified to reduce stress to within allowable tolerances. Recommended system modifications are assessed to ensure they do not adversely affect system flow performance and efficiency.

 

  image of Caesar II piping build-up for a thermal analysis of two, parallel 6-cylinder reciprocating compressor units
 

Caesar II piping build-up for a thermal analysis of two, parallel 6-cylinder reciprocating compressor units

A thermal design analysis typically includes:

  • Piping stress calculations according to applicable code [ASME code for pressure piping B31.3 (process), B31.8 (gas transmission), etc.]

  • Recommended modifications to the piping and restraint systems

  • Prediction of restraint loads and displacements

  • Prediction of loads on equipment (coolers, compressors, pressure vessels) to ensure code compliance

For more information about thermal stress analysis capabilities at SwRI or how you can contract with SwRI, please contact Ben A. White, P.E., at bwhite@swri.org or (210) 522-2554.  We can offer you the best approach for solving your thermal stress analysis problem.


©1998-2009 Copyright Southwest Research Institute
Printed from:
http://www.swri.org/4org/d18/mechflu/pulsat/thermstr.htm?

Southwest Research Institute® (SwRI®) is an independent, nonprofit, applied engineering and physical sciences research and development organization with 12 technical divisions using multidisciplinary approaches to problem solving. The Institute occupies more than 1,200 acres and provides nearly two million square feet of laboratories, test facilities, workshops, and offices for more than 3,300 employees who perform contract work for industry and government clients.